NEW CONSTRUCTION

 A-PermitB-PermitE-PermitR-PermitS-PermitSD-Permit
Street, curb, gutter, sidewalk X    
Alleys X    
Sidewalk only (curb and gutter exists)X     
Sidewalk only (curb only exists)X     
Storm drain mainline or catch basin work X    
Storm drain connection to catch basin (lateral)     X
Sewer mainline X    
Sewer house connection    X 
Street lights X    
Retaining wall in public right-of-way with street X    
Retaining wall in public right-of-way without street X    
Driveway bridge (may also include an LACFCD Permit) X    
Hydrology report X    
WIDENING / REALIGNMENT
Street, curb, gutter, sidewalk, alley X    
Sidewalk widening onlyX     
Alleys X    
Storm drain mainline or catch basin work X    
Sewer mainline X    
Sewer house connection    X 
Street light relocation (only if no B-Permit exists)X X   
REPLACEMENT
Street X    
Sidewalk onlyX     
Curb, gutter, sidewalkTBDTBD    
Alley (including longitudinal gutter) X    
Alley (Asphalt only) X    
DISCRETIONARY ACTION NOT LINKED TO A B-PERMIT
Replacement of excavated improvements in kind with no street light X    
Replacement of excavated improvements in kind with street light X    

Links to the public permit site, if available, can be found at BOE's website under "Permits"

  • A-Permit = Construction "A" Permit
  • B-Permit =  B Permit
  • E-Permit = Excavation Permit
  • R-Permit = Revocable Permit
  • S-Permit = Sewer Permit
  • SD-Permit = Storm Drain Permit 

TBD: To Be Determined by BOE Plan Checker